neia logo

 

Town of Grover- Marinette County
per  Ordinance  #2006-01

 Town of Grover website

 Download this page as a PDF

GUIDELINES FOR BUILDING PERMITS:    (permit term -  2 years)
Sanitary Permit for Septic Systems    

Zoning Permit   (if 1000’ of a lake or 300’ of a river)  Marinette County:  715-732-7535
Parcel Number of property (see tax statement)
All Contractors Name and license/cert. number (Plumber & Electrician must be licensed)
2 Sets of Building Plans and 1 Site Plan Showing Setbacks
Plumbing, Electrical, Heating layouts along with wall bracing on building plans
Estimate of Total Building Costs
Type of Foundation and Heating System – (include load calculations)
Energy Work Sheets  (Heat loss calculations-Usually provided by Heating Contractor)
Building Address
Deck or Garage square footage

SETBACKS:
Minimum setback from Road:    83’ from center of road or 50’ from edge of ROW, whichever is greater
Minimum setback from all other property lines: 20 feet

COSTS:
New Dwelling:   (includes 7 inspections)
1 per parcel
$350.00  plus .15 cents per square foot (finished)
33.00  State Seal
75.00  Electrical Inspection  (New Service)
30.00  per attached deck or garage

Manufactured Dwellings:   (includes 3 inspections)
1 per parcel
$200.00  plus .15 cents per sq. ft. of site built areas
33.00  State Seal if applicable
75.00  Electrical Inspection (New Service)
30.00  per attached deck or garage          

Used Mobile Homes: (includes 3 inspections)  10.0403
1 per parcel
$200.00

Starting without a permit – 2x original permit cost

Missed Inspections/Additional Inspections - $50.00 each

Plan Reviews, Early Starts, and Handicap ramps/Occupancy Permits – no charge

State Building Codes:   www.dsps.wi.gov/sb/SB-HomePage

Codes -  (SPS 320-325 -Uniform Dwelling)

Check payable to: Nature’s Edge Inspection Agency or Jane Meissner 715-245-1708
Mail to: Jane Meissner W11954 Kitty Dell Circle Crivitz, WI 54114
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.